Home News

18 main points of risk assessment in laboratory

Certification
China shengstone international limited certification
China shengstone international limited certification
Customer Reviews
The quality of the epoxy resin worktop is very good.

—— Nikolaos

Very appreciate for your professional service & higher standard quality control,

—— Karina

I'm Online Chat Now
Company News
18 main points of risk assessment in laboratory
Latest company news about 18 main points of risk assessment in laboratory

2018-8-20

 

 

Lab should carry on the risk assessment, it is necessary to evaluate according to the following contents:

1) The risk source such as chemical, physical and biological characteristics of the known or unknown, and the environment interaction, the relevant experimental data, historical data, the prevention and treatment, etc.;


2) related to the laboratory itself or lab has accident analysis;Draw lessons from the past and other laboratory case;

 

3) lab, the risk in the process of regular and irregular activities including all people entering the workplace and may involve personnel (such as: the contracting parties);Laboratory activities, such as testing, purchasing, and cleaning utensils are likely to have certain risk, such as to relevant personnel and these activities should be included in the scope of risk assessment;

 

4) the risk of facilities, equipment and other related;Laboratory instruments and equipment need to evaluate risk, including the risk of the device itself, and may cause the risk;

 

5) when applicable, experimental animal related risk;Some laboratory will be involved in experimental animals;

 

6) personnel related risk;Such as personnel health, ability, may affect the pressure of work, etc.;

 

7) the risks of accidents, accident;

 

8) used by misuse and malicious risks;

 

9) risk scope, nature and timing of the range of identifying risk, nature and the time limit, help to better control risk;Major forces concentrated corresponding risk.

 

 

10) probability assessment of risk occurrence;

 

11) possible harm and consequence analysis;

 

12) to determine the acceptable risk;

 

13) to eliminate, reduce or control the risk management measures and technical measures, and residual risk or take measures after the new risk assessment;

 

14) operating experience and the adaptation degree assessment of the risk control measures;

 

15) emergency measures and the evaluation of the expected effect;

 

16) to determine equipment requirements, identify training needs, to carry out the operation control input information;

 

17) to reduce the risk and control the harm to the required information, the evaluation of resources (including external resources);

 

18) for risk, needs, resources comprehensive assessment, feasibility, applicability, etc.

 

Pub Time : 2018-08-20 09:54:08 >> News list
Contact Details
shengstone international limited
Send your inquiry directly to us (0 / 3000)